EPD

EPD for HVAC Equipment

Manufacturers of chillers, VRF systems, precision cooling and air handling equipment are increasingly asked for Environmental Product Declarations by building designers, data-centre operators and public buyers who now count the embodied carbon of building services alongside their energy use. NLCCC prepares EPDs for HVAC equipment under ISO 14025 and the product category rules each market expects, from the life cycle assessment through third-party verification to publication.

Who asks for an HVAC EPD

  • Building services engineers and consultants, who need product data for whole-life carbon assessments of buildings.
  • Data-centre operators and developers, who report the embodied carbon of their cooling infrastructure.
  • Green building certification projects that award credits for products with a verified EPD.
  • Public and corporate buyers whose tenders include environmental criteria for building services equipment.

Products we cover

Chillers and heat pumps

  • Water-cooled chillers
  • Air-cooled chillers
  • Heat pumps and heat recovery units

Precision and data-centre cooling

  • CRAC and CRAH units
  • In-row and liquid cooling units
  • Condensers and dry coolers

Air-side and distributed systems

  • VRF systems and indoor units
  • Air handling units and fan coil units
  • Fans, coils and ventilation components

Which rules apply

HVAC EPDs are prepared under ISO 14025, with the product category rules of the programme operator the target market recognises. We confirm the rules for each product and market at the scoping stage.

  • Europe and international projects: EN 15804+A2, published through the International EPD System or another ECO Platform operator.
  • Electrical, electronic and HVAC-R equipment: the PEP ecopassport programme and its product-specific rules.
  • North America: the UL Environment Part A and Part B product category rules, where a current Part B exists for the product.
  • United Kingdom: where no EPD exists yet, an embodied carbon estimate to CIBSE TM65 can be prepared as an interim step.

What drives the result

  • Use stage: electricity consumed over the service life is usually the largest share of the result, so the declared operating scenario matters.
  • Refrigerant: the charge, its global warming potential and the leakage assumed during service and at end of life.
  • Materials: copper, steel and aluminium in heat exchangers, casings and pipework, and their recycled content.
  • Service life and end of life: the reference service life set by the rules, and the recovery of metals and refrigerant.

One model for a product range

HVAC manufacturers offer ranges of units that differ in capacity, compressor type, refrigerant and options. We build one model of the product family, so that results for each declared model come from the same verified study, and additional models can be declared at much lower cost than separate studies.

How we work

  1. 1Scoping call (30 minutes, free): product families, target markets, the operator and the rules that apply.
  2. 2Fixed-fee proposal covering the LCA, the EPD documents, verification and publication fees.
  3. 3Data collection using our templates: bills of materials, refrigerant data, rated performance, manufacturing energy, packaging and transport.
  4. 4LCA modelling and EPD drafting, reviewed with your team before verification.
  5. 5Independent third-party verification and publication with the programme operator.

Frequently asked questions

It depends on where the equipment is sold and who is asking. European projects usually accept EN 15804+A2 EPDs from ECO Platform operators, PEP ecopassport is widely used for HVAC-R equipment, and North American projects often expect UL Environment rules. We advise on the operator once we know the target market.