EPD

EPD for Electricity Generation and Solar Modules

Two groups ask for declared environmental data in this sector: generators, including independent power producers and captive plants, whose customers and lenders want verified figures per kilowatt-hour; and photovoltaic module manufacturers, whose European tenders and buyers score modules on carbon footprint. NLCCC prepares EPDs under ISO 14025 for electricity generation and for solar modules, and the life cycle assessments behind them.

Market Demand

Who asks for an electricity or solar EPD

  • Buyers of electricity under power purchase agreements, who need a declared figure per kilowatt-hour for their own reporting.
  • Lenders and investors applying environmental criteria to generation projects.
  • European public tenders and auctions for solar projects that score or cap the carbon footprint of the modules used.
  • Manufacturers whose own product EPDs need a verified dataset for captive or contracted electricity.
Scope of Coverage

Products we cover

Electricity generation

  • Solar photovoltaic plants, utility-scale and captive
  • Wind and hydro generation
  • Biomass and waste-to-energy plants
  • Captive and industrial power plants

Solar modules and components

  • Crystalline silicon modules, cells and wafers
  • Thin-film modules
  • Mounting structures and trackers
Inverters and electrical balance-of-system components are covered on the electrical equipment page.
Reporting Framework

What the declaration covers

For electricity, the declared unit is one kilowatt-hour delivered, and the declaration covers the construction and manufacture of the plant, its operation over its lifetime, and decommissioning. For solar modules, the declaration is usually cradle to gate per module or per kilowatt-peak, and the result is dominated by the upstream production of polysilicon, wafers and cells and by the electricity used to make them. Where the cells and wafers are manufactured therefore matters as much as the final assembly.

Supply Chain Integration

Captive power in your other EPDs

Manufacturers with captive solar or other renewable generation can use a plant-specific electricity dataset in their product EPDs, where the PCR's rules on electricity are met. A verified declaration for the captive plant makes that dataset defensible to the verifier and lowers the footprint declared for every product made with it.

Engagement Process

How we work

  1. 1Scoping call (30 minutes, free): the plant or product, who is asking, the operator and the PCR that applies.
  2. 2Fixed-fee proposal covering the LCA, the EPD documents, verification and publication fees.
  3. 3Data collection using our templates: plant or module bill of materials, generation or production data, operating inputs and end-of-life assumptions.
  4. 4LCA modelling and EPD drafting, reviewed with your team before verification.
  5. 5Third-party verification and publication with the programme operator.
Knowledge Base

Frequently asked questions

One kilowatt-hour of electricity delivered, with the plant's construction, operation and decommissioning allocated over its expected lifetime generation.